Construction Labour & Material Savings: The architectural design & engineering of both skyscrapers are unique. A post & beam, barrel, steel structure supports floor & ceiling cassettes that are factory manufactured & craned into position at five levels a day saving up to three years of construction time. Labour savings of up to 80% & 30% in material costs are possible.
Construction Time Savings: The value of the completed complex has almost doubled as a result of the bonus rental received from the construction time savings with the three years of additional rent & savings in finance & interest
Instead of building in four years, just one building, the ability to refinance, cash-out & build three additional buildings using the same construction system is now possible.
Profitable Design Elements: A 20% increase of salable building area has resulted from the addition of the sky garden dining balconies to provide a unique dining experience due to the location, design & height of the building,
the data transmission towers, the observation decks for the paying public to enjoy the spectacular panoramic views & the attached six-level mixed-use business, shopping, restaurant & recreational facility complex.